Tuesday, March 19, 2013

The Great Energy Expedition


Today we explored three different types of energy sources: hydroelectricity, coal fired power plant, and natural gas fracking. 

Hydroelectric (Built in 1933):
This plant was primarily built to prevent flooding and to allow for coal-boat navigation. It seems like a lot of the infrastructure in this town is set up for coal—the railroad, the dams, the back roads through the mountains, etc. At the dams, collecting hydroelectricity seemed like an afterthought; a consequence of the coal infrastructure. In total, this plant is a 24 MW facility (producing 210,000 MWh per year).
London Hydroelectric Plant, owned by American Electric Power
Lars excited about the tools in the hydroelectric plant
 
Coal Fired Power Plant (Built in 1953):
The coal fired power plant struck us more than anything we had seen so far. As we drove up to the site, we could see mountains of coal that were four stories tall. AEP, the company that owns the plant, was nice enough to feed us thanksgiving lunch, complete with lemonade and sweet tea! Once our tummies were full we went on a tour of the plant. We couldn’t believe the scale of the place. With only sixty people, they produce almost 4 million MWh of power every year, about 60 times Dartmouth’s annual consumption. And yet, this is a small plant in the scheme of power generation. After the tour we met the COO and the vice president of generation. They were very frank about EPA regulations and the fact that the plant will be shut down in the next three years. The plant is going to be shut down because it would not be economically feasible to invest in the new technology needed to comply with the new EPA regulations considering the outdated infrastructure of the plant and its old age. It was also interesting that they mentioned the very realistic prospect of natural gas becoming the primary supply of electricity in the near future; thus AEP is hoping to expand their production from just coal to coal and natural gas.
Appalachian Power Kanawha Coal Plant (54 day supply of electricity in the pile. Maximum capacity of 300,000 tons). 
Electricity substation outside the coal power plant that feeds into the transmission network.

Smoke Stack at Coal Power Plant
A natural gas hydrofracking well on the University of Charleston campus


Natural Gas Fracking (Built in 2003):
The natural gas site that we visited is located at the University of Charleston. Because of the natural gas that was found under their soccer field, the university is able to supply all of its lecectrcity from its own campus. Initially when the natural gas site was proposed by Triana there was significant opposition from the community and the university—people were afraid of explostions and disruptions to the land. Once the site was finished the community was pleasantly surprised by how insignificant the disruption was, dispelling their initial misconceptions. Triana has prepped multiple other sites for fracking, but because of the significantly reduced price of natural gas witnessed recently (it is now $2.20/1000 cubic feet) it is not profitable to pursure these alternative energy sources. Triana is waiting for prices to increases before pursuing these options –they are fairly certain this will happen in the near future (they are willing to produce once the price increases to $4/1000 cubic feet).
It seemed as though there were little reprecussions from pursuing natural gas fracking.
Another coal processing plant we passed during our drive to Charleston. Many of the towns we passed through had some type of coal power plant,  processing facility or shipping facility and we could see mines along many hillsides.




No comments:

Post a Comment