After touring a variety of operations extracting, processing, and burning fossil fuels over the past week, it was finally time to see some examples of renewable energy production in West Virginia! Sadly, due to the overnight blizzard, the wind farm we were supposed to visit had iced up overnight and so was too dangerous to get close to. Instead, our hosts quickly arranged a more extensive tour of the hydroelectric power plant we were already scheduled to see. Visiting first the dam and later the plant itself, we got a good idea of how the place worked. While the hydroelectric power plant supplies enough energy to power 100,000 homes, it is all used by a single factory, a smelting plant, nearby (and was, in fact, built in the 1930's to supply this exact plant with power).
When the New River was dammed up in the middle of the Depression, no permits were applied for, and no environmental laws were really in place or paid attention to. Today, the situation looks very different. The plant works just fine after 80 years and is conceptually really quite simple, although the engineering behind it is impressive. More relevant today is the discussion of how to manage this dam that is already in place. Whitewater rafters, climbers, fishermen, residents, companies, and many others have different interests and visions for the river. Mostly, they have different opinions of when and how much water should be released into the "dries" below the dam. We got to meet with a spokesperson for the whitewater rafting industry, as well as with the people managing the dam.
After lunch, we headed to D.C., where we will meet with people who work in various environmentally related fields.
--Fredrik '16
Photos: Fredrik Eriksson (with the help of Jenna Musco)
When the New River was dammed up in the middle of the Depression, no permits were applied for, and no environmental laws were really in place or paid attention to. Today, the situation looks very different. The plant works just fine after 80 years and is conceptually really quite simple, although the engineering behind it is impressive. More relevant today is the discussion of how to manage this dam that is already in place. Whitewater rafters, climbers, fishermen, residents, companies, and many others have different interests and visions for the river. Mostly, they have different opinions of when and how much water should be released into the "dries" below the dam. We got to meet with a spokesperson for the whitewater rafting industry, as well as with the people managing the dam.
After lunch, we headed to D.C., where we will meet with people who work in various environmentally related fields.
--Fredrik '16
Photos: Fredrik Eriksson (with the help of Jenna Musco)
The dam of the hydroelectric power plant. The plant is actually located 5 miles downstream; the water is diverted through a tunnel – the intake is visible on the right hand side of the dam – and led underground to the plant.
A more successful group photo. At the overlook; the dam from the picture above is to the right. The resulting lake is visible on the left, stretching into the distance.
Hydroelectric power plant turbine. The plant was built in the 1930's, and has required virtually no major maintenance since.
A more successful group photo, take 2.
New River Gorge. It is easily understood why West Virginia is somewhat of a whitewater rafting paradise.
New River Gorge. This time, Paige is impressed.